Full kitchen remodels

Full kitchen remodels, one team from demolition to backsplash

When the layout is the problem, new doors will not fix it. A full remodel lets you move the sink, add an island, open a wall and start over with storage that fits.

Open-plan kitchen with a dark stone island and stools, black globe pendants, built-in ovens and a living area beyond

Sequenced so trades are not waiting on each other

A kitchen remodel involves more trades than any other room: demolition, framing, plumbing, electrical, drywall, flooring, cabinets, counters, tile and paint. Most delays come from those steps landing in the wrong order or materials arriving late.

We order long-lead items early, confirm appliance specifications before cabinets are finalised, and schedule counter templating as soon as the boxes are set.

What a full remodel covers

Common kitchen layouts

Your room’s shape usually narrows this down to one or two options.

  • Galley

    Two parallel runs. Efficient for one cook; keep the aisle around 105–120 cm.

  • L-shape

    Two walls at a corner, often with an island. Good for open-plan rooms.

  • U-shape

    Three walls of storage. Lots of counter; watch the corners.

  • Island

    Extra prep space and seating. Needs clearance on all sides to work.

  • Peninsula

    An island attached at one end — useful where an island will not fit.

How it works

How the work unfolds

  1. Consultation

    How you cook, what you store, who uses the kitchen and what is not working now.

  2. Layout and selections

    Cabinet plan, appliances, counters, backsplash, lighting and flooring.

  3. Demolition and rough-in

    Old kitchen out, plumbing, electrical and venting adjusted for the new plan.

  4. Cabinets and counters

    Cabinets set level, counters templated and installed.

  5. Backsplash and finishing

    Tile, lighting, trim and touch-ups, then a final walkthrough.

Start with a free estimate

Questions

Full Kitchen Remodels: common questions

Still have a question? Ask us directly

What is the longest wait in a kitchen remodel?

Usually cabinets, then counters, which are templated after cabinets are installed. Ordering early and confirming appliance sizes first keeps the schedule tight.

Can we reuse our appliances?

Yes, as long as we know their exact dimensions before the cabinets are ordered.

Free estimate

Get an estimate for full kitchen remodels

Tell us what you have in mind. We reply within one business day.

Estimate request for: Full Kitchen Remodels

Call now Get estimate

Cookie preferences

Necessary

Keep the site working and remember your choices. Always on.

Analytics

Anonymous visit statistics (Google Analytics) so we can see which pages help homeowners.